Sporta 2 kvartāls
2024 2025 2026 2027 2028–2034 6 Q3 2025–Q2 2026 Installation of arterial utilities 2 Q3 2024–Q1 2025 Demolition and arterial infrastructure design projects 5 Q3–Q4 2025 Start of preparation works and demolishing of the buildings 9 Q2–Q3 2027 Commissioning 1 Q3–Q4 2024 Design in minimum composition 7 Q1 2026–Q3 2027 Main building construction works 8 Q1–Q3 2027 Finishing works Phase I, II Phase III–V 3 Q1–Q2 2025 Design&Build tender 4 Q2 2025–Q1 2026 Detail design preparation and approval 6. time line